Factory and Field Testing

Site Design & Construction

Ensuring the compression and other CNG equipment runs well at startup is an important role of the equipment supplier. Proper design and fabrication are critical, but equally important is a full shop performance test. ANGI performs a factory acceptance test on every compressor and dispenser we ship at the operating suction and discharge pressures at the site. We also check control functions, wiring connections, compressor skid vibration, flow rates and electrical loads.

ANGI, or our distributor, commission every compressor or dispenser product that ANGI builds. Part of the commissioning process is to ensure these systems function properly at their installation site at the specified operating conditions.

ANGI is also capable of designing and performing a wide range of shop and field tests to meet specific customer requirements.